Test Capability
Company UHV hall built in 2008 and put into use, its scale is designed and built in accordance with 1000kV/1000MVA transformer test, test hall 48 × 36 × 32m, six-sided shielding wall using Faraday cage structure.
So far, UHV hall has accumulated more than 300 sets of large power transformer test, focusing on projects 750kV/27OMVA transformer, 1000 kV / 400MVA transformers UHV all tests were India, Nigeria and 330kV customers supplied 400kV/270MVA / 300MVA power transformer has passed the China EPRI and KEMA in the Netherlands to witness the test laboratory, testing ability to obtain a well-known expert affirmed.
1, focusing on test equipment
1), the impulse voltage generator
Nominal voltage: 4800kV
Nominal Energy: 720kJ
Grade capacitors: 1.5μF
Class number: 24
Cut device 3600kV, truncated system delay devices delay cables and two sets of electronic pulse ignition device.
 
2), generator
(1)Frequency generator 15000kVA, rated output voltage 11kV, rated current of 787.3A.
(2)Dual-frequency generator 7500kVA, frequency of 50/60Hz.
(3)IF generator 2000kVA, frequency of 200Hz, the rated output voltage of 6.6kV.
3), test transformer:
(1)SZB-20000/11/2 × 30
(2)YDF-120000/66 test transformer
(3)750kV transformer test
4), capacitor
Selection of a single capacitor rated voltage 21kV, rated capacity 500kVAR; total 266000 kVAR; can be a single, three-phase conversion and Y △ conversion, the maximum compensation voltage 110kV.
 
2, the pilot project
序号
例 行 试 验
1
绕组电阻测量
2
电压比测量和联结组标号检定
3
短路阻抗及负载损耗测量
4
空载损耗和空载电流测量
5
长时间空载试验
6
绝缘电阻测量、吸收比和极化指数测量
7
绕组的介质损耗因数(tand)和电容测量
8
铁心和夹件绝缘电阻测量
9
感应耐压试验和局部放电测量
10
雷电全波冲击试验
11
操作冲击试验
12
外施交流耐压试验
13
套管试验
14
套管电流互感器试验
15
冷却器(散热器)的密封试验
16
变压器密封试验
17
绝缘油试验
18
绝缘油中溶解气体分析
19
其他部件的检查试验:
20
变压器绕组变形试验。
21
分接开关试验(操作试验、切换时间测量、过渡电阻测量等)。
 
型 式 试 验
1
温升试验(新产品提供温升试验报告,常规产品提供同类型产品的型式试验报告)
2
雷电截波冲击试验
3
中性点全波雷电冲击试验
 
特 殊 试 验
1
声级测定
2
油箱机械强度试验
3
空载电流的谐波测量
4
风扇电机所吸取功率的测量
5
零序阻抗测量
6
电晕及无线电干扰测量
7
暂态传输特性测量
8
1.1倍额定电流发热试验
9
油流带电测量
10
开启油泵局部放电测量